ICL have instructed NYPM to concentrate on two main projects at Teesdock for 2023:
1/ Refurbishment of all the Teesdock Switchrooms.
This entails replacement of all the old MCCs and refurbishment of the actual infrastructure to make them fit for purpose.
Above is an example of the existing MCCs.
2/ Refurbishment and modification to the polysilo.
Currently, the Polysilo is a stand alone building. The scope is to connect to TT1 on site and feed it high level conveyor to fill the silo and also and hopper and inclined conveyor to feed out of the silo onto 371.
The project includes for the removal of existing infrastructure - old grain conveyor system for replacement of an up to 1000tph polyhalite conveyor system.