in Q2 2022, NYPM were contracted to assist in the design, procurement, manufacture, installation and commissioning of a local electrical room for the Teesside Gas Power Plant to develop the Ineos Breagh Gas field expansion.
The LER started out at 50mL 6mW single storey split into three sections and was successfully delivered Q1 2023.